A Quick Glance

  • black-arrow

    Delivered by highly qualified and experienced instructors

  • black-arrow

    Trusted globally by Leading Brands

  • black-arrow

    Understand how to implement Lean Six Sigma methods

  • black-arrow

    Higher Salaries after Certification

Whenever services or products are provided by an organisation, many waste processes creep up during the production phase. Typically there are seven kinds of such wastes - Defects, Overproduction, Waiting, Non-used employee talent, Transportation, Inventory, Motion, and Excessive Processing (remembered as DOWNTIME). The concepts of Lean Six Sigma help the organisation to do away with the waste processes.Japanese have termed this waste elimination processes as ‘muda’ which helps the organisation achieve the following aims:

  • Sort
  • Straighten
  • Shine
  • Standardise
  • Sustain

At Pentagon Training, the delegates get to know about the methodologies used by the Lean Six Sigma professionals from certified instructors.

Who should take this course

The target audience for this course are the professionals who hold a valid Lean Six Sigma Green Belt Certification.

  • Lean Six Sigma Black Belt Upgrade course is intended for those who are Lean Six Sigma Green Belt Certification holder and want to upgrade to Lean Six Sigma Black Belt Certification
  • The professionals who want to improve organisational processes by using the methodologies of Lean Six Sigma 
  • Individuals who already have experience of working in the same domain for over a year and who want to upgrade their skills in this domain
More

Prerequisites

The delegates need to possess a Lean Six Sigma Green Belt certification in order to attend this course.

More

What Will You Learn

  • Identify the optimal DMAIC tools 
  • Learn to identify and resolve problems that may occur in DMAIC projects
  • Learn how to effectively manage team dynamics and understand how to work with multiple levels of leadership for achieving success in organisational projects
  • Determine the relationship between key inputs and process outputs for statistical analysis
More

What's included

  Course Overview

Waste comes from unnecessary steps in the process of production within the organisation. On the other hand, waste also results from variation within the process in case of Six Sigma.  

Waste elimination can be achieved by following the principles laid down in the various Lean Six Sigma Belt courses. The Lean Six Sigma Black Belt Upgrade course is available to those professionals who have already certified as Lean Six Sigma Green Belt. The Black Belt Upgrade course allows the professionals to cover the contents of just the Lean Six Sigma Black Belt course. Unlike the Black Belt course under which Lean Six Sigma Yellow Belt and Green Belt are covered, this upgrade course covers neither of them.

EXAM:

The exam will be conducted at the end of the trainingThe exam consists of 100 Multiple Choice, scenario based Questions (MCQ’s).The delegate would need to choose one correct answer  from the given four and proceed further.

One will need to have 70 percentage marks i.e. 70 questions must be correct from 100 to clear the exam. Our trainers will make sure that the delegates have gone through all the concepts of the subject so that they can easily clear the exam in the first attempt.

The language used in the exam would be English. In case, the delegate is not comfortable with the exam in English; we can try to provide the exam in another language by consulting our trainer or management. Selection of language depends upon the comfort of the trainer. Therefore, we can’t guarantee this will happen.

All other details regarding exams will be provided during the training by our experts.

More

  Course Content

Section 1

  • Quick review of Lean Six Sigma Green Belt
  • Project Charters or Workshop
  • Jobs to be Done
  • Expectations on results
  • What is Minitab?
  • Basic Statistics 2
  • Project Report Outs
  • Daily Tech backs
  • Define Change Management
  • Exercise based on Value Stream Mapping
  • Project Management
  • Measurement System Analysis
    • Attribute Agreement Analysis
    • Continuous Data
  • Capability Analysis
    • Attribute Data
    • Continuous Normal Data
    • Continuous Non-normal D

Section 2

  • Reviews of Project
  • Review of Assumption Testing
  • Methods and Techniques of Minitab Graphical
  • Flow Review
  • Central Limit Theorem
  • Confidence Intervals
  • Pull Review
  • Mean & Variance Tests
  • Proportions Testing
  • Contingency Tables GOF
  • Sample Size Selection
  • Correlation/Linear Regression
  • One Way ANOVA
  • Improving Phase Roadmap
  • Getting Familiar With Design of Experiments (DOE)
  • Full Factorial Designs
  • 2K Factorial Designs
  • Attribute DOE
  • Project Reviews

Section 3

  • 2K Fractional DOE Designs
  • Simulation Exercise DMAIC / DOE
  • Logistic Regression – An Introduction
  • Advanced Regression
  • Introduction to Control Charts
  • Variable SPC Techniques
  • Attribute SPC Techniques
  • Control Methods
  • Introducing  Surveys

DMAIC Review & Final Reports

More

Lean Six Sigma Black Belt Upgrade

What is Lean?

Lean is the mathematical approach for streamlining both service processes and manufacturing by removing waste while continuing to deliver value to customers or clients. Lean is not just a set of tools; it stems from cultural roots which manifest in the business. A Lean Culture also called Lean Management is the foundation of improvement of Lean Process. During Lean Culture, improvement is exponentially more likely to be sustained so that a continuous improvement environment can be created in the organisation. It is the combination of defining customer value, aligning around a central purpose, striving for perfection while respecting and developing employees at the same time.

A Lean Process has following characteristics:

  • A lean process is usually faster than other processes
  • It is more efficient and economical than others
  • It also delivers satisfactory quality services to customers

A Lean system can be achieved by removing waste from the processes that are no more needed to have a successful outcome for the project. After completely removing the waste, we only include those steps which are required for customer satisfaction.

What is the Lean Six Sigma process?

Lean Six Sigma process includes following steps:

  • Define
  • Measure
  • Analyse
  • Improve
  • Control


Lean Six Sigma Black Belt Upgrade Enquiry

 

Enquire Now


----- OR -------

Reach us at +44 1344 961530 or info@pentagonit.co.uk for more information.

About Sunderland

Sunderland

Sunderland also referred as Sunderland A.F.C, Tyne and Wear. It is located on River Wear in England. Sunderland comprises of the neighbouring towns like Washington and Houghton-le-Spring as well as city. Sunderland is referred as UK Parliament Constituency from 1832 to 1950. Sunderland A.F.C is a professional football team.

History

The population of Sunderland was 146,000 during 1901. First electric trams started in Sunderland in 1900. However in the 1940s and 195-s electric trams were replaced by buses. Last trams ran in Sunderland in 1954. Sunderland Technical College was opened in 1901. In 1904 Bede Memorial was raised and in 1907 Commissioners offices were built. In 1907 Empire Theatre was also opened. In 1909 Barnes Park was opened. Backhouse Park in 1923. Thompson Park in 1933. In 1902 Roker Breakwater was built and South Breakwater in 1914.

Boundaries of Borough were extended in 1928 to include Southwick and Fulwell. In 1929 New Wear Bridge has been constructed. A general hospital was opened in 1929. In 1934 was Deep Water Quay was opened. Council started slum clearance in Sunderland in 1930s. New council houses were built to replace the old slums located in Ford Hall, Marley Pots and Leechmere. During Second World War 267 people were killed due to German bombing. About 1000 houses were destroyed, and about 3000 got damaged. In 1967 boundaries of Sunderland were extended to include Silksworth, South Hylton, Herrington, Ryhope and Castletown. In 1969 Sunderland Polytechnic was founded and was made university in 1992. In 1970 civic centre and the new town hall was built. In 1973 new Police station has been constructed.

In 1973 Monkwearmouth Station Museum was opened. In 1974 North East Aircraft Museum was founded and new General Hospital was opened in Sunderland in 1978. Sunderland suffered in the 1930s when third of the men were unemployed. During 1950s Joblessness lowered and in 1980s unemployment returned. In late 20th century, Sunderland’s coal mining declined rapidly. After 1986 no more coal was exported. New industries replaced the old ones. Sunderland is well known for its car making industry. Other industries in Sunderland include electronic engineering, papermaking, mechanical engineering and textiles. Sunderland was made a city in the year 1992. In 1995 Sunderland Library and Arts Centre was opened. In 1997 Stadium of Light was opened and in 1998 National Glass Centre was opened. In 2002 Tyne and Wear Metro was expanded to Sunderland. In the beginning years of 21st century, Sunniside area was regenerated. Sunderland Aquatic Centre was opened in 2008. Now the population of Sunderland is 275,000.

 

More