A Quick Glance

  • black-arrow

    Learn to manage excess waste and increase organisations productivity

  • black-arrow

    Lean Six Sigma Black Belt Certification is recognized by major brands in all the industries

  • black-arrow

    Not limited to just one particular industry

  • black-arrow

    Certified Lean Six Sigma Instructors to teach the course

  • black-arrow

    Learn from Global Training Providers

The organisations, today, seek to provide the best of services and products in a minimum time possible. To do so, it becomes a must that any kind of extra or unwanted processes must be removed. In Japanese terminology, these waste elimination processes are known as ‘muda’ which accomplishes the five tasks – sort, straighten, shine, standardise, sustain.

A Professional with a Lean Six Sigma Black Belt certification is one who provides these solutions at the highest level. A Lean Six Sigma Black Belt professional leads a group of Green Belt professionals to overcome any such processes and take the organisation forward. We at Pentagon, help the delegates by providing them with this course through the professionals who understand Lean Six Sigma thoroughly.

Who should take this course

Those professionals who want to improve their skills and have experience in managing Green Belt Projects can sit for the training where they will learn to manage more challenging and complex projects.

More

Prerequisites

The delegates who wish to acquire this certification must already hold a Lean Six Sigma Practitioner Green Belt Certification. In order to get the certification, the candidates must come with a project that they are supposed to complete after the course is over.

More

What Will You Learn

Having completed the Black Belt certification, the delegates will be familiar with the following concepts of Lean Six Sigma:

  • Define and Plan Projects for improvement including the developing charters.
  • Determining and managing stakeholder requirements.
  • Understand and improve the various qualitative and quantitative tools that are used to gauge and analyse business process.
  • Use  Lean principles to determine customer value, determine value streams, understand flow develop pull systems and ensure perfection.
  • Analyse, quantify and choose the most suitable solutions.
  • Control business processes and understand process change through the use of SPC and change management skills
  • Manage Green Belt projects and resources

 

More

What's included

  Course Overview

Ever since World War II, Japan had been devising ways to bring about an economic boom targeted at its recovery. Japan had been following Kaizen business model for this purpose. In 1986, the United States came up with Six Sigma with its first implementation in Motorola Inc. In the 1990’s this was adopted by General Electric also and in the early years of the 21st Century, Six Sigma and Lean collaborated to bring about Lean Six Sigma.

Lean is a managerial concept that aims at reducing the seven kinds of waste while Six Sigma focuses on reducing processes variations of all sorts thereby helping to link the processes together tightly.

Lean Six Sigma provides various levels of certifications each providing the delegate with a higher understanding of Lean Six Sigma. These certifications are shown in the figure.

Lean Six Sigma

Those delegates who wish to sit for the exam they have taken some training from an authorised/accredited institute, or trainer, though this is not a prerequisite.Again, delegates wishing to sit for the exam must also have a real-world Lean Six Sigma project experience(this is also only recommended and not required).

On completion of the course and the exam, the delegates are certified by the International Association for Six Sigma Certification™ as Belk Belt Certified Professionals. The only third party Certification Association within the Lean Six Sigma Industry is the IASSC.

Exams

The Lean Six Sigma Black Belt Exam takes place during the second Friday afternoon at the end of the course. The Lean Six Sigma Black Belt Exam contains  150 questions. It a closed book proctored exam that lasts for 4-hours.

More

  Course Content

  • Define Phase
    • The Basics of Six Sigma
      • Meanings of Six Sigma
      • General History of Six Sigma & Continuous Improvement
      • Deliverables of a Lean Six Sigma Project
      • The Problem Solving Strategy Y = f(x)
      • Voice of the Customer, Business and Employee
      • Six Sigma Roles & Responsibilities
    • The Fundamentals of Six Sigma
      • Defining a Process
      • Serious Quality Characteristics (CTQ’s)
      • Poor Quality Cost
      • The Pareto Analysis (80:20 rule)
      • Six Sigma - Measurement Standards
    • Selecting Lean Six Sigma Projects
      • Building a Business Case & Project Charter
      • Developing Project Metrics
      • Financial Evaluation & Benefits Capture
    • Understanding The Lean Enterprise
      • Lean – An Understanding and its History
      • The Combination of Lean & Six Sigma
      • The Seven Waste Elements
      • 5S
        • Straighten, Shine, Standardise, Self-Discipline, Sort
  • Measure Phase
    • Process Definition
      • Cause & Effect / Fishbone Diagrams
      • Process Mapping, SIPOC, Value Stream Map
      • X-Y Diagram
      • Failure Modes & Effects Analysis (FMEA)
    • Six Sigma Statistics
      • Basic Statistics
      • Descriptive Statistics
      • Normal Distributions & Normality
      • Graphical Analysis
    • Measurement System Analysis
      • Precision & Accuracy
      • Bias, Linearity & Stability
      • Gage Repeatability & Reproducibility
      • Variable & Attribute MSA
    • Process Capability
      • Capability Analysis
      • Concept of Stability
      • Attribute & Discrete Capability
      • Monitoring Techniques
  • Analyze Phase
    • Patterns of Variation
      • Multi-Vari Analysis
      • Classes of Distributions
    • Inferential Statistics
      • Understanding Inference
      • Sampling Techniques & Uses
      • Central Limit Theorem
    • Hypothesis Testing
      • General Concepts & Goals of Hypothesis Testing
      • Significance; Practical vs. Statistical
      • Risk; Alpha & Beta
      • Types of Hypothesis Test
    • Hypothesis Testing with Normal Data
      • 1 & 2 sample t-tests
      • 1 sample variance
      • One Way ANOVA
    • Hypothesis Testing with Non-Normal Data
      • Mann-Whitney
      • Kruskal-Wallis
      • Mood’s Median
      • Friedman
      • 1 Sample Sign
      • 1 Sample Wilcoxon
      • One and Two Sample Proportion
      • Chi-Squared (Contingency Tables)
  • Improve Phase
    • Simple Linear Regression
      • Correlation
      • Regression Equations
      • Residuals Analysis
    • Multiple Regression Analysis
      • Non- Linear Regression
      • Multiple Linear Regression
      • Confidence & Prediction Intervals
      • Residuals Analysis
      • Data Transformation, Box-Cox
    • Designed Experiments
      • Experiment Objectives
      • Experimental Methods
      • Experiment Design Considerations
    • Full Factorial Experiments
      • 2k Full Factorial Designs
      • Linear & Quadratic Mathematical Models
      • Balanced & Orthogonal Designs
      • Fit, Diagnose Model and Center Points
    • Fractional Factorial Experiments
      • Designs
      • Confounding Effects
      • Experimental Resolution
  • Control Phase
    • Lean Controls
      • Control Methods for 5S
      • Kanban
      • Poka-Yoke (Mistake Proofing)
    • Statistical Process Control (SPC)
      • Data Collection for SPC
      • I-MR Chart
      • Xbar-R Chart
      • U Chart
      • P Chart
      • NP Chart
      • Xbar-S Chart
      • CumSum Chart
      • EWMA Chart
      • Control Methods
      • Control Chart Anatomy
      • Subgroups, Impact of Variation, Frequency of Sampling
      • Center Line & Control Limit Calculations
    • Six Sigma Control Plans
      • Cost Benefit Analysis
      • Elements of the Control Plan
      • Elements of the Response Plan
More


Lean Six Sigma Black Belt Enquiry

 

Enquire Now


----- OR -------

Reach us at +44 1344 961530 or info@pentagonit.co.uk for more information.

About Sunderland

Sunderland

Sunderland also referred as Sunderland A.F.C, Tyne and Wear. It is located on River Wear in England. Sunderland comprises of the neighbouring towns like Washington and Houghton-le-Spring as well as city. Sunderland is referred as UK Parliament Constituency from 1832 to 1950. Sunderland A.F.C is a professional football team.

History

The population of Sunderland was 146,000 during 1901. First electric trams started in Sunderland in 1900. However in the 1940s and 195-s electric trams were replaced by buses. Last trams ran in Sunderland in 1954. Sunderland Technical College was opened in 1901. In 1904 Bede Memorial was raised and in 1907 Commissioners offices were built. In 1907 Empire Theatre was also opened. In 1909 Barnes Park was opened. Backhouse Park in 1923. Thompson Park in 1933. In 1902 Roker Breakwater was built and South Breakwater in 1914.

Boundaries of Borough were extended in 1928 to include Southwick and Fulwell. In 1929 New Wear Bridge has been constructed. A general hospital was opened in 1929. In 1934 was Deep Water Quay was opened. Council started slum clearance in Sunderland in 1930s. New council houses were built to replace the old slums located in Ford Hall, Marley Pots and Leechmere. During Second World War 267 people were killed due to German bombing. About 1000 houses were destroyed, and about 3000 got damaged. In 1967 boundaries of Sunderland were extended to include Silksworth, South Hylton, Herrington, Ryhope and Castletown. In 1969 Sunderland Polytechnic was founded and was made university in 1992. In 1970 civic centre and the new town hall was built. In 1973 new Police station has been constructed.

In 1973 Monkwearmouth Station Museum was opened. In 1974 North East Aircraft Museum was founded and new General Hospital was opened in Sunderland in 1978. Sunderland suffered in the 1930s when third of the men were unemployed. During 1950s Joblessness lowered and in 1980s unemployment returned. In late 20th century, Sunderland’s coal mining declined rapidly. After 1986 no more coal was exported. New industries replaced the old ones. Sunderland is well known for its car making industry. Other industries in Sunderland include electronic engineering, papermaking, mechanical engineering and textiles. Sunderland was made a city in the year 1992. In 1995 Sunderland Library and Arts Centre was opened. In 1997 Stadium of Light was opened and in 1998 National Glass Centre was opened. In 2002 Tyne and Wear Metro was expanded to Sunderland. In the beginning years of 21st century, Sunniside area was regenerated. Sunderland Aquatic Centre was opened in 2008. Now the population of Sunderland is 275,000.

 

More